
Decks & Fences in Calgary
Decks that don't heave, twist or splinter after two winters.
Composite and cedar decks on frost-depth footings, structural rebuilds, aluminum and glass railing, pergolas and fencing, permitted, inspected and warrantied.
Scope of work
What our decks & fences work covers
New composite and cedar decks, structural rebuilds, aluminum and glass railing, privacy screens, pergolas and fence replacement built for Alberta winters.
- Composite and cedar deck construction
- Deck structural rebuilds and re-decking
- Aluminum, glass and cable railing
- Privacy screens and pergolas
- Fence replacement and gates
- Concrete pads, footings and steps
How it runs
A schedule you can plan around.
- 01
Site & design
We measure grade, check setbacks, and lay out the deck footprint, stairs and railing style with you on site.
- 02
Permit & quote
Drawings, permit application, and a fixed quote covering footings, framing, decking, railing and skirting.
- 03
Footings & frame
Frost-depth piles or piers, inspected, then pressure-treated framing with hardware rated for exterior exposure.
- 04
Finish & handover
Decking, fascia, stairs, railing and gates installed, site cleaned, and warranty plus care instructions handed over.
Before & after
Decks & Fences before & after
Deck and fence before-and-afters are being photographed on current builds. In the meantime, browse the finished deck work below or ask us for job references in your area.
Recent jobs
Decks & Fences photos

Questions
Straight answers, no runaround.
- Composite or cedar for a Calgary deck?
- Composite costs more upfront but survives our freeze-thaw cycles with no staining and no splinters. Cedar is warmer underfoot and cheaper, but plan on re-oiling every second year.
- Do decks need a permit in Calgary?
- Generally yes once the deck is over 0.6 m above grade or attached to the house. We confirm the requirement and handle the application and inspections.
- How deep do the footings go?
- Below frost line, typically 4 ft in the Calgary area, using helical piles or concrete piers so the deck doesn't heave in spring.
- Can you rebuild just the surface of my old deck?
- If the structure and footings pass inspection, yes: new decking, fasteners and railing on the existing frame is a big saving. We'll tell you honestly if the frame isn't worth keeping.
- How long does a deck build take?
- One to two weeks for most residential decks after footings are in and inspected. Glass railing lead times can add a week or two.
- Do you build fences and privacy screens too?
- Yes, fence replacement, gates, privacy screens and pergolas, usually quoted alongside the deck so the whole yard is finished in one visit.
What Calgary homeowners say
Real jobs, real neighbours.
Verified reviews live on our Google Business Profile, read every one of them, unedited.
“Our roof was hail-damaged and Coast View handled the whole insurance claim. Tear-off and new shingles done in two days, yard cleaner than when they arrived.”
“They developed our basement top to bottom, framing, the stone fireplace wall, bathroom, flooring. Same two guys every day and the quote never moved.”
“Stucco on the south wall was cracked and patched badly by a previous contractor. Coast View re-coated it and added brick to the base. Looks like a new house.”
Free estimate
Book a free, no-pressure estimate
Tell us about the project and we'll come measure, photograph, and give you a fixed written quote, usually within 48 hours of the visit.
- Fixed written quotes, no surprise change orders
- Our own crews, no subcontractor churn
- Workmanship warranty on every job
- Insurance claim and hail damage experience
Prefer to talk?
(403) 615-1019